Skip to main content
Loading…
This section is included in your selections.

The size, slope alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and back-filling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the town. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the Association for Standard Test Materials and Uniform Plumbing Code shall be used. (Ord. 550 § 2, 2012)