Skip to main content
Loading…
This section is included in your selections.

(1) Water/Sewer Utility.

(a) Utility service deposit

$100.00 water OR sewer only accounts;

$200.00 for water AND sewer accounts

(b) Water connect/disconnect

$30.00

(c) Late charge

$30.00; provided, no additional late charges shall be added after service has been abandoned.

(2) Hydrant Construction Meter.

(a) Hydrant connect/disconnect

$50.00

(b) Hydrant meter construction

One-month basic fee for 2" meter plus overage (350 cu. ft.)

(c) Hydrant meter damage deposit

$150.00 *refundable after inspection

(d) Unauthorized water use

$225.00 min. plus $1.00/100 cu. ft. of usage

(3) Driveway Construction Permits. $5.00 for each lineal foot of curb cut. (Ord. 652 § 3, 2021; Ord. 432 § 2, 2002; Ord. 421 § 1, 2000; Ord. 415 § 4, 2000; Ord. 400 § 3, 1999)